# CMCSA Funding Rate on Bitget

As of 2026-11-18 09:16 UTC, the CMCSA perpetual on Bitget pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 2nd highest of 5 exchanges shown, against a volume-weighted average of 0.0000% per 8 hours (0.00% APR). Over the last 7 days Bitget averaged -0.0005% per 8 hours (-0.57% APR).

## Funding on every exchange

| Exchange | Market | Funding rate | Interval | APR | Next funding |
| --- | --- | --- | --- | --- | --- |
| [WEEX](https://arbtide.com/funding-rates/cmcsa/weex) | [CMCSA/USDT](https://www.weex.com/futures/CMCSA-USDT) | 0.0022% | 8h | 2.41% | 2026-11-18 09:16 UTC |
| [Bitget](https://arbtide.com/funding-rates/cmcsa/bitget) | [CMCSA/USDT](https://www.bitget.com/futures/usdt/CMCSAUSDT) | 0.0000% | 8h | 0.00% | — |
| [Gate](https://arbtide.com/funding-rates/cmcsa/gate) | [CMCSA/USDT](https://www.gate.com/futures/USDT/CMCSA_USDT) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |
| [HTX](https://arbtide.com/funding-rates/cmcsa/htx) | [CMCSA/USDT](https://www.htx.com/futures/linear_swap/exchange#contract_code=CMCSA-USDT&contract_type=swap&type=cross) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |
| [LBank](https://arbtide.com/funding-rates/cmcsa/lbank) | [CMCSA/USDT](https://www.lbank.com/futures/cmcsausdt) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |

## Frequently asked questions

### What is the CMCSA funding rate on Bitget?

0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is -0.0005% per 8 hours (-0.57% APR).

### How often does Bitget pay CMCSA funding?

Every 8 hours.

### Is CMCSA funding on Bitget higher than on other exchanges?

Bitget is the 2nd highest of 5 exchanges shown. The highest is WEEX at 0.0022% per 8h (2.41% APR) and the lowest is LBank at 0.0000% per 8h (0.00% APR).

### How do you arbitrage CMCSA funding with Bitget?

Long CMCSA on Bitget and short on WEEX for a gross spread of 0.0022% per 8 hours (2.41% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.
