# SPOT Funding Rate on Gate

As of 2026-11-18 09:35 UTC, the SPOT perpetual on Gate pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 4th highest of 5 exchanges shown, against a volume-weighted average of 0.0021% per 8 hours (2.32% APR). Over the last 7 days Gate averaged 0.0000% per 8 hours (0.00% APR). The next funding is at 2026-11-18 16:00 UTC.

## Funding on every exchange

| Exchange | Market | Funding rate | Interval | APR | Next funding |
| --- | --- | --- | --- | --- | --- |
| [WEEX](https://arbtide.com/funding-rates/spot/weex) | [SPOT/USDT](https://www.weex.com/futures/SPOT-USDT) | 0.0106% | 8h | 11.61% | 2026-11-18 09:35 UTC |
| [Bybit](https://arbtide.com/funding-rates/spot/bybit) | [SPOT/USDT](https://www.bybit.com/trade/usdt/SPOTUSDT) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |
| [Bitget](https://arbtide.com/funding-rates/spot/bitget) | [SPOT/USDT](https://www.bitget.com/futures/usdt/SPOTUSDT) | 0.0000% | 8h | 0.00% | — |
| [Gate](https://arbtide.com/funding-rates/spot/gate) | [SPOT/USDT](https://www.gate.com/futures/USDT/SPOT_USDT) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |
| [HTX](https://arbtide.com/funding-rates/spot/htx) | [SPOT/USDT](https://www.htx.com/futures/linear_swap/exchange#contract_code=SPOT-USDT&contract_type=swap&type=cross) | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC |

## Frequently asked questions

### What is the SPOT funding rate on Gate?

0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is 0.0000% per 8 hours (0.00% APR).

### How often does Gate pay SPOT funding?

Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.

### Is SPOT funding on Gate higher than on other exchanges?

Gate is the 4th highest of 5 exchanges shown. The highest is WEEX at 0.0106% per 8h (11.61% APR) and the lowest is HTX at 0.0000% per 8h (0.00% APR).

### How do you arbitrage SPOT funding with Gate?

Long SPOT on Gate and short on WEEX for a gross spread of 0.0106% per 8 hours (11.61% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.
