# ZCAT Funding Rate on LBank

As of 2026-10-07 11:20 UTC, the ZCAT perpetual on LBank pays 0.0143% per 4h, 0.0286% per 8 hours (31.32% APR), so longs pay shorts. That is the 4th highest of 5 exchanges shown, against a volume-weighted average of 0.0399% per 8 hours (43.72% APR). Over the last 7 days LBank averaged 0.0089% per 8 hours (9.76% APR). The next funding is at 2026-10-07 12:00 UTC.

## Funding on every exchange

| Exchange | Market | Funding rate | Interval | APR | Next funding |
| --- | --- | --- | --- | --- | --- |
| [Aster](https://arbtide.com/funding-rates/zcat/aster) | [ZCAT/USDT:USDT](https://www.asterdex.com/en/trade/pro/futures/ZCATUSDT) | 0.0681% | 1h | 596.56% | — |
| [MEXC](https://arbtide.com/funding-rates/zcat/mexc) | [ZCAT/USDT:USDT](https://www.mexc.com/futures/ZCAT_USDT) | 0.0143% | 4h | 31.32% | 2026-10-07 12:00 UTC |
| [BingX](https://arbtide.com/funding-rates/zcat/bingx) | [ZCAT/USDT:USDT](https://bingx.com/en/perpetual/ZCAT-USDT) | 0.0143% | 4h | 31.32% | — |
| [LBank](https://arbtide.com/funding-rates/zcat/lbank) | [ZCAT/USDT:USDT](https://www.lbank.com/futures/zcatusdt) | 0.0143% | 4h | 31.32% | 2026-10-07 12:00 UTC |
| [Gate](https://arbtide.com/funding-rates/zcat/gate) | [ZCAT/USDT:USDT](https://www.gate.com/futures/USDT/ZCAT_USDT) | 0.0068% | 4h | 14.89% | 2026-10-07 12:00 UTC |

## Frequently asked questions

### What is the ZCAT funding rate on LBank?

0.0143% per 4h, or 0.0286% per 8 hours (31.32% APR), so longs pay shorts. The 7-day average is 0.0089% per 8 hours (9.76% APR).

### How often does LBank pay ZCAT funding?

Every 4 hours. The next payment is at 2026-10-07 12:00 UTC.

### Is ZCAT funding on LBank higher than on other exchanges?

LBank is the 4th highest of 5 exchanges shown. The highest is MEXC at 0.0143% per 4h (31.32% APR) and the lowest is LBank at 0.0143% per 4h (31.32% APR).

### How do you arbitrage ZCAT funding with LBank?

Long ZCAT on LBank and short on LBank for a gross spread of 0.0000% per 8 hours (0.00% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.
