ADI Funding Rate on Gate
LiveAs of · refreshes every 30 s
As of 2026-11-18 09:46 UTC, the ADI perpetual on Gate pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 6th highest of 7 exchanges shown, against a volume-weighted average of 0.0020% per 8 hours (2.19% APR). Over the last 7 days Gate averaged 0.0000% per 8 hours (0.00% APR). The next funding is at 2026-11-18 16:00 UTC.
- Rate per 8h
- 0.0000%
- 7-day average per 8h
- 0.0000%
- Next funding
- 2026-11-18 16:00 UTC
- Rank
- 6 of 7
ADI funding on Gate, per 8h
ADI funding arbitrage with Gate
The widest pairing for Gate is long ADI on Gate and short on HTX. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.
ADI funding on every exchange
| HTX | ADI/USDT | 0.0100% | 8h | 10.95% | 2026-11-18 16:00 UTC | Live |
| Extended | ADI/USDC | 0.0005% | 1h | 4.38% | 2026-11-18 10:00 UTC | Live |
| Bybit | ADI/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| OKX | ADI/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| Bitget | ADI/USDT | 0.0000% | 8h | 0.00% | — | Live |
| Gate | ADI/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| XT.COM | ADI/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
Showing 7 of 7
All ADI funding rates Gate funding rates
Frequently asked questions
- What is the ADI funding rate on Gate?
- 0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is 0.0000% per 8 hours (0.00% APR).
- How often does Gate pay ADI funding?
- Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.
- Is ADI funding on Gate higher than on other exchanges?
- Gate is the 6th highest of 7 exchanges shown. The highest is HTX at 0.0100% per 8h (10.95% APR) and the lowest is XT.COM at 0.0000% per 8h (0.00% APR).
- How do you arbitrage ADI funding with Gate?
- Long ADI on Gate and short on HTX for a gross spread of 0.0100% per 8 hours (10.95% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.