ArbTide

KOSPI Funding Rate on MEXC

Live

As of 2026-11-18 09:56 UTC, the KOSPI perpetual on MEXC pays -0.0112% per 8h, -0.0112% per 8 hours (-12.26% APR), so shorts pay longs. That is the 1st highest of 2 exchanges shown, against a volume-weighted average of -0.0112% per 8 hours (-12.26% APR). Over the last 7 days MEXC averaged 0.0000% per 8 hours (0.03% APR). The next funding is at 2026-11-18 16:00 UTC.

Rate per 8h
-0.0112%
7-day average per 8h
0.0000%
Next funding
2026-11-18 16:00 UTC
Rank
1 of 2

KOSPI funding on MEXC, per 8h

KOSPI funding on MEXC, per 8 hours, hourly, last 7 days-0.0200%-0.0100%0.0000%0.0100%0.0200%Nov 11Nov 13Nov 14Nov 16Nov 18HW 0.0200%LW -0.0149%-0.0112%

Compare MEXC with other exchanges over 7 or 30 days

KOSPI funding arbitrage with MEXC

LongWEEX-0.0112%/8hShortMEXC-0.0112%/8hFunding gap 0.0000% per 8h before fees

The widest pairing for MEXC is long KOSPI on WEEX and short on MEXC. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.

KOSPI funding on every exchange

  • -12.26%
    APR
    Funding rate
    -0.0112%
    Interval
    8h
    Next funding
    2026-11-18 16:00 UTC
    Data
    Live

  • -12.26%
    APR
    Funding rate
    -0.0112%
    Interval
    8h
    Next funding
    2026-11-18 09:56 UTC
    Data
    Live

Showing 2 of 2

All KOSPI funding rates MEXC funding rates

Frequently asked questions

What is the KOSPI funding rate on MEXC?
-0.0112% per 8h, or -0.0112% per 8 hours (-12.26% APR), so shorts pay longs. The 7-day average is 0.0000% per 8 hours (0.03% APR).
How often does MEXC pay KOSPI funding?
Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.
Is KOSPI funding on MEXC higher than on other exchanges?
MEXC is the 1st highest of 2 exchanges shown. The highest is MEXC at -0.0112% per 8h (-12.26% APR) and the lowest is WEEX at -0.0112% per 8h (-12.26% APR).
How do you arbitrage KOSPI funding with MEXC?
Long KOSPI on WEEX and short on MEXC for a gross spread of 0.0000% per 8 hours (0.00% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.