MDT Funding Rate on Gate
LiveAs of · refreshes every 30 s
As of 2026-11-18 09:46 UTC, the MDT perpetual on Gate pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 3rd highest of 7 exchanges shown, against a volume-weighted average of 0.0000% per 8 hours (0.00% APR). Over the last 7 days Gate averaged 0.0000% per 8 hours (0.00% APR). The next funding is at 2026-11-18 16:00 UTC.
- Rate per 8h
- 0.0000%
- 7-day average per 8h
- 0.0000%
- Next funding
- 2026-11-18 16:00 UTC
- Rank
- 3 of 7
MDT funding on Gate, per 8h
MDT funding arbitrage with Gate
The widest pairing for Gate is long MDT on Toobit and short on Gate. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.
MDT funding on every exchange
| Binance | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| Bitget | MDT/USDT | 0.0000% | 8h | 0.00% | — | Live |
| Gate | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| HTX | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| XT.COM | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| LBank | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| Toobit | MDT/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
Showing 7 of 7
All MDT funding rates Gate funding rates
Frequently asked questions
- What is the MDT funding rate on Gate?
- 0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is 0.0000% per 8 hours (0.00% APR).
- How often does Gate pay MDT funding?
- Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.
- Is MDT funding on Gate higher than on other exchanges?
- Gate is the 3rd highest of 7 exchanges shown. The highest is Binance at 0.0000% per 8h (0.00% APR) and the lowest is Toobit at 0.0000% per 8h (0.00% APR).
- How do you arbitrage MDT funding with Gate?
- Long MDT on Toobit and short on Gate for a gross spread of 0.0000% per 8 hours (0.00% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.