ArbTide

USDE Funding Rate on Bybit

Live

As of 2026-10-03 21:41 UTC, the USDE perpetual on Bybit pays 0.0025% per 8h, 0.0025% per 8 hours (2.74% APR), so longs pay shorts. That is the 1st highest of 2 exchanges shown, against a volume-weighted average of -0.0099% per 8 hours (-10.89% APR). Over the last 7 days Bybit averaged 0.0058% per 8 hours (6.32% APR). The next funding is at 2026-10-04 00:00 UTC.

Rate per 8h
0.0025%
7-day average per 8h
0.0058%
Next funding
2026-10-04 00:00 UTC
Rank
1 of 2

USDE funding on Bybit, per 8h

USDE funding on Bybit, per 8 hours, hourly, last 7 days-0.0025%0.0000%0.0025%0.0050%0.0075%0.0100%13:0021:0005:0013:0021:00HW 0.0090%LW -0.0000%0.0032%

Compare Bybit with other exchanges over 7 or 30 days

USDE funding arbitrage with Bybit

LongLBank-0.0100%/8hShortBybit0.0025%/8hFunding gap 0.0125% per 8h before fees

The widest pairing for Bybit is long USDE on LBank and short on Bybit. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.

USDE funding on every exchange

  • 2.74%
    APR
    Funding rate
    0.0025%
    Interval
    8h
    Next funding
    2026-10-04 00:00 UTC
    Data
    Live

  • -10.95%
    APR
    Funding rate
    -0.0100%
    Interval
    8h
    Next funding
    2026-10-04 00:00 UTC
    Data
    Live

Showing 2 of 2

All USDE funding rates Bybit funding rates

Frequently asked questions

What is the USDE funding rate on Bybit?
0.0025% per 8h, or 0.0025% per 8 hours (2.74% APR), so longs pay shorts. The 7-day average is 0.0058% per 8 hours (6.32% APR).
How often does Bybit pay USDE funding?
Every 8 hours. The next payment is at 2026-10-04 00:00 UTC.
Is USDE funding on Bybit higher than on other exchanges?
Bybit is the 1st highest of 2 exchanges shown. The highest is Bybit at 0.0025% per 8h (2.74% APR) and the lowest is LBank at -0.0100% per 8h (-10.95% APR).
How do you arbitrage USDE funding with Bybit?
Long USDE on LBank and short on Bybit for a gross spread of 0.0125% per 8 hours (13.69% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.