MPWR Funding Rate on Gate
LiveAs of · refreshes every 30 s
As of 2026-11-18 09:42 UTC, the MPWR perpetual on Gate pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 3rd highest of 7 exchanges shown, against a volume-weighted average of 0.0000% per 8 hours (0.00% APR). Over the last 7 days Gate averaged 0.0000% per 8 hours (0.00% APR). The next funding is at 2026-11-18 16:00 UTC.
- Rate per 8h
- 0.0000%
- 7-day average per 8h
- 0.0000%
- Next funding
- 2026-11-18 16:00 UTC
- Rank
- 3 of 7
MPWR funding on Gate, per 8h
MPWR funding arbitrage with Gate
The widest pairing for Gate is long MPWR on WEEX and short on Gate. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.
MPWR funding on every exchange
| Extended | MPWR/USDC | 0.0005% | 1h | 4.38% | 2026-11-18 10:00 UTC | Live |
| OKX | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| Gate | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| HTX | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| XT.COM | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| LBank | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| WEEX | MPWR/USDT | -0.0105% | 8h | -11.45% | 2026-11-18 09:42 UTC | Live |
Showing 7 of 7
All MPWR funding rates Gate funding rates
Frequently asked questions
- What is the MPWR funding rate on Gate?
- 0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is 0.0000% per 8 hours (0.00% APR).
- How often does Gate pay MPWR funding?
- Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.
- Is MPWR funding on Gate higher than on other exchanges?
- Gate is the 3rd highest of 7 exchanges shown. The highest is Extended at 0.0005% per 1h (4.38% APR) and the lowest is WEEX at -0.0105% per 8h (-11.45% APR).
- How do you arbitrage MPWR funding with Gate?
- Long MPWR on WEEX and short on Gate for a gross spread of 0.0105% per 8 hours (11.45% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.