MPWR Funding Rate on LBank
LiveAs of · refreshes every 30 s
As of 2026-11-18 10:15 UTC, the MPWR perpetual on LBank pays 0.0000% per 8h, 0.0000% per 8 hours (0.00% APR), so neither side pays. That is the 6th highest of 7 exchanges shown, against a volume-weighted average of 0.0000% per 8 hours (0.00% APR). Over the last 7 days LBank averaged -0.0038% per 8 hours (-4.17% APR). The next funding is at 2026-11-18 16:00 UTC.
- Rate per 8h
- 0.0000%
- 7-day average per 8h
- -0.0038%
- Next funding
- 2026-11-18 16:00 UTC
- Rank
- 6 of 7
MPWR funding on LBank, per 8h
MPWR funding arbitrage with LBank
The widest pairing for LBank is long MPWR on WEEX and short on LBank. Fees, slippage and the price basis between venues reduce the net return. Learn what a funding rate is.
MPWR funding on every exchange
| Extended | MPWR/USDC | 0.0005% | 1h | 4.38% | 2026-11-18 11:00 UTC | Live |
| OKX | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| Gate | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| HTX | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| XT.COM | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| LBank | MPWR/USDT | 0.0000% | 8h | 0.00% | 2026-11-18 16:00 UTC | Live |
| WEEX | MPWR/USDT | -0.0105% | 8h | -11.45% | 2026-11-18 10:15 UTC | Live |
Showing 7 of 7
All MPWR funding rates LBank funding rates
Frequently asked questions
- What is the MPWR funding rate on LBank?
- 0.0000% per 8h, or 0.0000% per 8 hours (0.00% APR), so neither side pays. The 7-day average is -0.0038% per 8 hours (-4.17% APR).
- How often does LBank pay MPWR funding?
- Every 8 hours. The next payment is at 2026-11-18 16:00 UTC.
- Is MPWR funding on LBank higher than on other exchanges?
- LBank is the 6th highest of 7 exchanges shown. The highest is Extended at 0.0005% per 1h (4.38% APR) and the lowest is WEEX at -0.0105% per 8h (-11.45% APR).
- How do you arbitrage MPWR funding with LBank?
- Long MPWR on WEEX and short on LBank for a gross spread of 0.0105% per 8 hours (11.45% APR). Trading fees, slippage and the price basis between the two venues reduce the net return.